Rocket Shipment Canceled
- Share via
WASHINGTON — Morton Thiokol Inc. today canceled the scheduled Saturday shipment to Cape Canaveral, Fla., of booster rockets for the first post-Challenger space shuttle flight, as engineers focused on the rockets’ nozzle movement to learn why a new component broke into pieces.
The rockets, which were to have been used for the flight in June, were built with the same “boot ring” that broke in a full-scale test firing last week. “We were scheduled to start shipping the flight motors to the cape on Jan. 2,” said Thomas Russell, a Morton Thiokol vice president. “At this point, we don’t believe that is going to happen.”
More to Read
Inside the business of entertainment
The Wide Shot brings you news, analysis and insights on everything from streaming wars to production — and what it all means for the future.
You may occasionally receive promotional content from the Los Angeles Times.